Construction stage support

Design supervision

Design supervision means controlling how the interior design project is delivered, from the first day of the renovation to final handover. Between approved drawings and a finished interior there is ten times more work than the design itself took. The designer runs the project personally: checking every stage against the drawings, catching the contractor’s deviations and recording the result, so that what is built matches what was designed.

Nadezhda and Alexey Gusev, founders of the ARTEVRIKA studio, in the living room of a completed project: dark wall panelling, a stone niche and a chandelier with crystal drops
Leave a requestCalculate the cost · from €700/month

20

Years in business

250+

Completed projects

In person

Or remotely, depending on the project

Who it's for

When design supervision is needed

01

I’ve ordered a design project

You want the build to follow exactly what’s set out in the documentation.

02

A complex or high-cost property

The cost of mistakes is high, and implementation quality determines everything.

03

No way to visit the site regularly

You need professional oversight and written reporting.

04

The team simplifies decisions

You need the designer on site so the original intent survives to completion.

Tasks

What tasks it solves

What the service handles for you in practice.

  1. 01We protect the project concept on site. The contractor builds from drawings, not based on personal judgement.
  2. 02We catch deviations in materials and finishes while rework is still affordable.
  3. 03We handle construction questions on the spot — with no downtime and no need for your constant presence.
  4. 04We refine documentation for the actual property: for example, adjusting the tile layout to match the real wall conditions.
  5. 05We keep the progress of work under control. You can see every stage through photos and the supervision log.

Scope

What is included in design supervision for renovation

  1. 01Site visits — at least four scheduled a month, plus two unscheduled.
  2. 02Compliance control — we check progress against the approved interior design project.
  3. 03Consultations — we explain the project drawings and sketches to builders and contractors.
  4. 04Sample control — we record that finishing materials match the approved samples.
  5. 05Documentation updates — we issue the clarifying drawings that arise during construction.
  6. 06Visits to showrooms and production facilities — together with the client and independently, before purchasing: we review materials in person and, if a required item is unavailable, select an equivalent alternative without deviating from the project.
  7. 07Reporting — we maintain a design supervision log, with regular reports and photo documentation of the work.
  8. 08Final material selection — we approve textures and colours that cannot be chosen during the project stage: paint colour, plaster types.
  9. 09Coordination of engineering projects — together with the foreman, we monitor that engineering is implemented according to the design project.
  10. 10A single project space — we keep one communication channel between the architect, designer, project planner, furnishing team, and contractors: questions are resolved within hours, and you can see the work in progress without gathering information in parts.
  11. 11Decisions you cannot make on paper — paint drawdowns, decorative plaster, fabrics and textiles, grouts and décor are chosen on site: in the room’s own light and against the finishes already laid.
  12. 12Setting out against the walls as built — we mark the porcelain tile and moulding layout in pencil on site and agree it with you. With patterned tile the laying order decides everything: without marking, the team takes the material in whatever order it comes and the pattern does not line up.

Result

What you get

Not just pictures, but a complete set of solutions ready to build from.

  • An interior delivered according to the project — the intent reaches the finish without losses.
  • Construction issues are handled on-site, without your constant presence.
  • Supervision log, step-by-step reports, and photo documentation of the entire build process.
  • Deviations are recorded while fixing them is still inexpensive.

Cost

from €700/month

Starting price

Final cost depends on floor area, scope of work, and timelines. A precise estimate takes just a couple of minutes in our calculator.

Calculate the cost

Process

How design supervision works

Each stage ends with a clear deliverable you receive in hand.

01

Stage

Start of works

We come in at the start of the renovation and hand the project over to the site team

A shared understanding of the project at the start

02

Stage

Scheduled site visits

We align the progress of the work, samples and materials with the project

Construction proceeds according to the project

03

Stage

Handling questions and making adjustments

We answer questions and issue clarifications to the documentation

Up-to-date documentation for the site

04

Stage

Reporting

Logbook, reports, and photo documentation

Clear and transparent progress

05

Stage

Final handover

Final selection of materials and completion monitoring

The finished interior matches the project

Expert

Who provides supervision

Portrait of a woman with curly hair, in a dark jacket, soft studio light against a green background

Face of the studio

Nadezhda Guseva

Chief Designer

I look for a solution where beauty and comfort do not compete with each other. Speaker and founder of a design school.

Honestly

Important to know

We set the boundaries of the service upfront, so there are no surprises.

  • Construction and installation works. The studio offers construction as a separate service: you can take it together with supervision, or run the build yourself and leave us supervision only.
  • Procurement and supply of materials, furniture and equipment. Choosing textures and colours on site, yes; supply and logistics belong to furnishing and procurement.
  • Warranty responsibility for work the studio did not perform. If construction is carried out by a third-party contractor, we record deviations in the supervision log, and the party that builds fixes them and is responsible under warranty. When we perform the construction ourselves, responsibility for the work is ours.
  • Project changes outside the approved interior design project. New solutions and revisions of sections are documented as a separate task — this keeps the project under clear documentation control.
  • Managing the site team. The builders are run by a foreman, which is a separate construction management service.

Why us

Why ARTEVRIKA

01

The author of the project supervises the build

The construction is checked for alignment with the original intent by the person who created the project, not by an external controller.

02

No fewer than 4 site visits per month

Plus unscheduled visits for disputed issues. Construction is not left without oversight.

03

Supervision log and photo documentation

You see the progress of work through reports, not only at the final handover

04

20 years on site, not just at the drawing board

We know where the build usually drifts from the design, and we check those places first.

Questions

Frequently asked questions

How much does design supervision cost and what does the price depend on?

Supervision starts from from €700/month. The final figure depends on the floor area, how complex the project is, travel to the site and how long the build runs. We price it for the specific project — leave a request.

How many times does the designer visit the site?

At least four scheduled site visits a month, plus two unscheduled ones. The frequency is set in the contract and can be increased at critical stages, such as finishing work or the installation of complex structures. We work with clients both in person and remotely, depending on the project.

Is design supervision the same as construction management?

No, these are two different jobs and you can commission them separately. The designer controls delivery: checks progress against the project, records discrepancies and resolves technical questions. The build is run by a foreman, which is the construction management service. The studio also does the construction itself, as a separate service: you can take it together with supervision, or run the build yourself and leave us supervision only.

Can design supervision be commissioned if the project was done by another studio?

We normally supervise the build of our own design project. Supervising someone else’s project we look at case by case: we need to be sure the documentation is complete enough for real control.

Why pay for supervision if there is a foreman?

A foreman runs the construction process but is not answerable for whether the result matches the design project. That is exactly where things drift: the tile layout comes out wrong, the material has the wrong texture, sockets move. Supervision catches deviations while they are still cheap to fix.

What exactly is included in design supervision?

Site visits to the property (at least 4 scheduled plus 2 unscheduled per month), ensuring work matches the project, checking materials against the approved samples, consulting builders using the drawings, issuing clarifying documentation, visits to showrooms and production facilities, maintaining a supervision log with photo documentation, final selection of colours and textures, coordinating engineering solutions with the design project.

What is not included and what does another professional handle?

Design supervision does not include construction and installation works (performed by the contractor), procurement and delivery of materials and furniture (this is furnishing and procurement), or design changes outside the approved interior design project (we arrange those as a separate task). The studio does not manage contractors, and it is not responsible for construction timelines or for the contractor’s workmanship quality under warranty.

How does reporting work and how will I stay informed?

After each visit you receive a report with photographs of the completed work and any points recorded. In parallel we keep a design supervision log, a running document covering the whole course of the project.

Who carries out the supervision?

Design supervision is run by Nadezhda Guseva, the studio’s Chief Designer and the author of the project. Decisions on site are taken by the person who designed it, so nothing is lost in handover.

How to arrange design supervision and when is the best time to start?

We plug in from day one of the renovation — that’s when the key structural decisions are set. Leave a request or ask for a cost estimate — we will agree on the format, visit frequency, and the start date.

Design supervision

We visit the site every week

At least four planned visits per month plus unscheduled visits for disputed issues. The schedule is set out in the contract; after each visit, you receive a report with photo documentation.

Calculate the design supervision cost
Studio designer on site during a design supervision visit, the space mid-fit-out

On-site visit

We review what was done since the last visit and resolve any disputed points on site.

Ceiling soundproofing and cable routing before the suspended ceiling installation

Ceiling sound insulation

The boards are in and the cable is run: we sign it off before the ceiling is closed up.

Close-up of a suspended ceiling assembly: profile and grille

Suspended ceiling junction detail

Abutment of the profile and the grille: the gap and the seam line are checked up close.

Prepared floor substrate and film-protected walls before finishing work

Subfloor base

Flatness and the joints between sheets are inspected before the final covering is applied.

Large-format porcelain stoneware being laid over waterproofing on site

Large-format installation

Set out to the drawings: the stone pattern runs through and the joints stay under control.

Installed wall light with a crystal shade on a hand-painted wall

Wall light fixture installation

Height and centreline are checked against the wall mural; the light temperature against the project.

Room before handover: herringbone parquet, built-in furniture, a chandelier still in its packaging

Lighting and built-in furniture

The chandelier is in; the packaging comes off last, after the dusty work.

Herringbone parquet and a built-in wardrobe with a hand-painted finish in the apartment corridor

Flooring and carpentry

We sign off the herringbone direction and the junction with the built-in cabinetry before handover.

Hallway with mirrored panels, a stone floor and lighting as specified in the design

Assembled entryway

Mirrors, stone and light come together: this is what supervision is for.

Consultation

Let's discuss your project

Leave your contact details — we'll get back to you within one business day, answer your questions and suggest the next step. 20 years in the market, 250+ completed projects.

Nadezhda and Alexey Gusev, founders of the ARTEVRIKA studio, in the living room of a completed project: dark wall panelling, a stone niche and a chandelier with crystal drops