Interior design project or renovation without one: how to choose

Алексей Гусев, генеральный директор студии АРТэврика

Author

Aleksei Gusev

Published

Reading time

8 min

Renovation without an interior design project is possible, but decisions about layout, materials and services don't disappear: they simply move from the design stage to the building site, where they get made quickly, without a view of the whole interior, and often once some adjoining work is already finished. Redoing something once it's installed costs many times more than adjusting a drawing. A design project moves those decisions to a stage where a correction costs hours rather than weeks, through measurements and a brief, a layout, visualisation and technical documentation that a crew can build from without improvising. Below is a candid look at when renovating by eye is enough, and when it ends up costing more than a full project.

Interior design project or renovation without one — the short answer

Renovation without a design project is justified when the scope is limited to finishing work within the existing layout: the plan and services stay unchanged, and the material decisions are few and simple. As soon as the brief involves reconfiguring the layout, a new furniture arrangement, or changes to lighting or service points, on-the-spot decisions become a source of rework rather than savings.

What gets decided on the spot when there's no project

Without an agreed project, decisions about layout, materials and services don't go away — they simply have to be made on site instead of at a designer's desk. A socket ends up somewhere other than where the furniture was meant to go, a recess for an appliance turns out the wrong width, and materials get bought as the need arises, with no single schedule and no fixed budget. The issue isn't who makes the call: a client is entirely capable of deciding things themselves, and in practice often does. The issue is the conditions under which those decisions have to be made:

  • the crew needs an answer right now, with no pause to think it through;
  • the decision can't be checked against the interior as a whole — neighbouring materials, light, furniture;
  • some adjoining decisions are already built, and the new one has to fit around what's already there;
  • changing it after the fact can mean redoing work that's already finished;
  • the cost of a possible mistake has already grown by this point — material has been bought, work has been paid for.

None of these points depends on how skilled the crew is. Each follows from the moment at which the decision is made.

What a design project gives you instead of decisions made by eye

A design project settles the same questions (where the socket goes, how wide the recess is, what a detail is built from), but before work starts, not during it. It rests on four modules: measurements and a brief, a layout, visualisation, and technical documentation with drawings and details that a crew can build from without improvising. Running through the whole process is a schedule: a table of materials, furniture and prices that settles the “we'll buy it as we go” question from the very start. A detailed breakdown of what's included and how it's staged is in the article “Interior design project: a full breakdown”.

Kitchen-living room area, bay-window perspective: a grey sofa, poufs, a coffee table, dark shelving and soft evening light
Kitchen-living-dining room — project "Interior design of an apartment, 180 m²"

When renovation without a project is genuinely justified

The honest line here isn't the size of the space but the nature of the task — where there are no irreversible decisions that are costly to redo.

Renovation without a full design project is justified if:

  • no reconfiguring of the layout or moving load-bearing structures is required;
  • the work doesn't touch wet areas or services — ventilation, electrics, plumbing;
  • the brief is limited to a cosmetic update or a partial redesign — furniture, lighting, decor;
  • you expect to live there for three to five years, as with temporary or rented accommodation.

It isn't justified if the brief involves reconfiguring the layout, wet areas — a kitchen, bathrooms — complex services, demanding materials, or an interior meant to last for years: there, the cost of a mistake on site is many times higher than the cost of a correction on a drawing.

Master bathroom with a pale stone niche, a built-in white vanity unit and a bathtub, illuminated panelling softly lighting the space
Master bathroom — project "Interior design of an apartment, 180 m²"

In the studio's own work, this principle shows up in two projects. One was a temporary apartment: without a large-scale renovation, the kitchen was replaced and the furniture, lighting and decor updated — the clients expected to live there for three to five years, and a full design project would have been excessive for that brief. On a private residential project, the work went ahead with no reconfiguring and no wet-area work — targeted design of individual zones and selection of pieces, without touching the services or structure.

The cost of a mistake: correcting a drawing versus correcting after installation

The logic of a design project is that it moves the cost of a mistake from the construction stage to the design stage. A designer can correct a tile layout, a socket height or the width of a recess on a drawing within hours — it takes updating the document and agreeing the change with the client. The same correction after the material is already installed means demolishing and redoing it: days or weeks of downtime, buying materials again, and usually an extra payment to the crew for the repeat work.

In practice, it looks like this:

  • A socket ends up behind a cabinet. Moving it after the finishing work means an electrician, chasing the wall, patching it, and the painter's work redone.
  • Plumbing is routed to the wrong spot. Removing the tiles, moving the connection point, new tiles, and repeating every adjoining job.
  • The size of a built-in wardrobe wasn't accounted for. Reworking the furniture to fit the recess, or the recess to fit the furniture — depending on which was built first.
  • Ventilation wasn't planned for. By the time anyone remembers, the ceiling is already installed, and it becomes a trade-off between services and looks instead of a solution that satisfies both.

In buying a design project, a client isn't buying pictures of a future interior — they're buying a lower cost of uncertainty: every one of these decisions is made in advance, agreed and recorded in a document, before the cost of a mistake has had a chance to grow.

A project isn't only about avoiding mistakes

A design project isn't just insurance against a botched renovation. It's a system for designing the outcome, and it has three levels of value.

Predictability. Before construction starts, it's clear what the result will be: how each zone will look, how the light will fall, how the materials will work together — not after it's too late to change anything.

Control. Architecture, furniture, lighting, plumbing, services and budget can be tied together in advance, instead of being agreed one decision at a time, in reaction to what's already been built.

Quality of the result. A project can design things that simply can't be worked out on the spot: built-in furniture to the actual dimensions, lighting scenarios, shadow-gap details, tile layouts, material junctions, bespoke pieces.

Cosy living area within a kitchen-living-dining room: soft sofas, a round coffee table with a book and a black vase, a grey marble floor, soft light
Kitchen-living-dining room — project "Interior design of an apartment, 180 m²"

The third level is the key one for ARTEVRIKA. The result takes shape at a designer's desk, as details and scenarios are worked through, not by eye on site.

How to decide: a short checklist

The decision should be based on the actual scope of the brief, not on a gut feeling that “ours is simple”. Four questions worth asking before you start:

  • Is the layout or zoning changing — even moving a single partition needs an agreed decision, not placement decided on the fly.
  • Are the services affected — moving sockets, light fittings or plumbing points is almost always easier and cheaper to fix on a drawing than to move once installed.
  • Who's running the build — working with a familiar crew without a written brief removes no more risk than working with an unfamiliar contractor: decisions about the outcome still need to be recorded somewhere.
  • Are you prepared to cover the cost of redoing work yourself — if the budget and timeline are tight and there's no room for error, the cost of a design project at the start is almost always lower than the cost of redoing the work at the end.

If at least two of the four answers lean towards “yes, there's a risk”, the logical next step isn't to order attractive pictures but to move the key decisions to a stage where a mistake costs a designer a few hours, not the demolition of finished work. For a sense of how long a full cycle takes, see the article “How long a design project takes: real timelines by stage”. If you need a full set of decisions and documents for your own property, the service page “Interior design project” describes the packages and terms. For a single question that doesn't call for a full project, for instance whether renovating without a project is enough for the task at hand, a one-off design consultation will do.

Questions

Frequently asked questions

Can renovation be done at all without a design project?

Yes — the question isn't whether it's allowed, but when and under what conditions the decisions get made. Without a project, the layout, materials and the placement of points have to be worked out on site, as work proceeds, with no agreed budget or schedule. For a small amount of work within the existing layout, that's a workable scenario; once services, zoning or style start changing, the risk of redoing work grows noticeably.

What's the main risk of renovating without a project, even with an experienced crew?

An experienced crew doesn't replace an agreed decision: it settles questions of execution, not questions of what the outcome should be. A socket, a recess for furniture, or the height of a built-in fitting decided on the spot may not match what the client originally had in mind, and that only comes to light after installation, not at the stage where a correction would have taken the designer an hour instead of requiring demolition.

How much more expensive is redoing work after installation than correcting a project drawing?

Many times more expensive and slower: a designer can correct a layout or a detail on a drawing within hours, while the same correction after the material is already installed means demolishing and redoing it — days or weeks of downtime and buying the material again. The studio assesses the exact figure for a specific space individually.

Where should you start if the renovation has already begun and there's no project?

With a pause before the next irreversible stage — usually finishing work, electrics or plumbing. In a consultation, the designer assesses which decisions can still be adjusted without demolition and which are already fixed, then proposes the amount of documentation needed to cover the remaining stages without improvising.

Which should you choose for a small cosmetic renovation: space planning or a full design project?

If the layout and services stay unchanged and it's a matter of replacing finishes within the existing footprint, a targeted decision on materials and arrangement is usually enough — without the full cycle of visualisation and technical documentation. If zoning is changing, service points are being added, or the brief goes beyond cosmetics, it makes more sense to plan for a full design project from the start — redoing an underestimated scope costs more than a broader brief at the outset.

Practice

Journal

Related articles

Living room with a gold-leaf panel and armchairs in textured upholstery

Process

Interior design project: a full breakdown

What an interior design project is, what it consists of and how long it takes: the layout, 3D visualisation, technical documentation and procurement schedule, with timelines for a property of around 100 m², from ARTEVRIKA studio.